The bathroom is done. All the pipes are boxed in and the ceiling and boxing have been painted. All it needs now is a mirror and a toilet roll holder. |
The main bedroom is also all papered and painted (ceiling, skirting boards, door frame, walls, even the radiator). Papering into the window recesses was a real challenge in all the bedrooms. |
The window in the second bedroom. This radiator needed painting as well - in the same colour as the woodwork. |
No comments:
Post a Comment